Slobozhanske, UA
To ensure uninterrupted heat supply for the hospital of the Slobozhanske Village Council, LLC DB "Architect Expert", commissioned by LLC "Construction Company STEK" and funded by the World Health Organization, developed a project for a vital facility – a 1 MW block-modular boiler house with auxiliary buildings and structures for the Slobozhanske Central Hospital.
The boiler house, manufactured by LLC "ARES-UKRAINE", is supplied in full factory readiness and equipped with two solid-fuel fire-tube boilers Altep KVT Max, 600 kW each.
In addition to the modular boiler house itself, the following buildings and structures are located on the site: